Dear Wakabi, Thank you for raising the question on whether the Ministry ignored best practices in procurement. The answer is No. There are three approved methods of procurement, that is, open tender, selective tender and single sourcing. Open tender you have got to adverise and any interested party can bid to supply service. It is a lengthy procedure (takes a minimum 45 days). It is the most competitive of all. Logically it applies to goods that can be obtained from many sources. Selective tendering however, is mostly applied to a sitiation where the popolation of the suppliers is limited as in Marine works. There are two companies, that is, Tyco and Alcatel that have the necesary experience to do such jobs. There are three other companies, that is, NEC, Fujistu and Global Marine/Huaweii that are usually subcontracted by the larger two. They have limited experience compared to the big two. Therefore it would have been absolutely non sense and wasteful to advertise for the the works in the local papers. Single sourcing is used where there is only one supplier of service/good or where there is an emergence. The committee which is tasked with the Teams project comprising the Investment Secretary, Director, Directorate of Procurement, MD Telkom, Solocitor General, and CCK Director General agreed to fast track the project by seeking authority from Treasury to procure Detailed Feasibility Study (DFS), Detailed Technical Study (DTS), and The Mirine Survey (MS)using the later methods and subjected Financial Arrager (FA) tender to an open tender. If you look at the overall project, the four services DFS, DTS, MS and FA are crucial to determining the time the project takes. Three of these projects DFS, DTS, and FA are complete and once the MS is complete, it would enable us to procure the supply contract with sufficient knowledge. Secoindly, whoever is awarded the contract, will actually immediately procure the material since all the information is available. The argument that the MS is given along with the Suply contract does not hold water since there are many cable networks that have used the model. EASSY for example will not know the material requirement until the MS is complete. In technical terms they are several months behind Teams. You must understand that there are several interested parties, some who want to make quick bucks. Ask yourself: what is it they are seeing that our people can't see? Consider Germany cable operators bagging in more that 6 billion euros in the last world cup in one month. My friend we need a serious talk. Seriously, if I had my way, I would give the entire works as a tunkey project. By now we could be at least three months to getting connected. Regards Bitange Ndemo. ---------------------------------------------- This message has been scanned for viruses and dangerous content by Jambo MailScanner, and is believed to be clean. --------------------------------------------- "easy access to the world"
Dr. Ndemo, Thanks for the elaborate explanation for which i have a question and caution; Q. Why is private sector, Academia and CS not represented on the Teams Project Committee given that it is a multi-stakeholder approach, correct me if am wrong? C. As much as am for SPEED, lets make sure that we do all the checks and balances because some omissions may end up sticking us in the bud. Eric here On 14 Mar 2007, at 09:09, bitange@jambo.co.ke wrote:
Dear Wakabi, Thank you for raising the question on whether the Ministry ignored best practices in procurement. The answer is No. There are three approved methods of procurement, that is, open tender, selective tender and single sourcing. Open tender you have got to adverise and any interested party can bid to supply service. It is a lengthy procedure (takes a minimum 45 days). It is the most competitive of all. Logically it applies to goods that can be obtained from many sources.
Selective tendering however, is mostly applied to a sitiation where the popolation of the suppliers is limited as in Marine works. There are two companies, that is, Tyco and Alcatel that have the necesary experience to do such jobs. There are three other companies, that is, NEC, Fujistu and Global Marine/Huaweii that are usually subcontracted by the larger two. They have limited experience compared to the big two. Therefore it would have been absolutely non sense and wasteful to advertise for the the works in the local papers.
Single sourcing is used where there is only one supplier of service/ good or where there is an emergence. The committee which is tasked with the Teams project comprising the Investment Secretary, Director, Directorate of Procurement, MD Telkom, Solocitor General, and CCK Director General agreed to fast track the project by seeking authority from Treasury to procure Detailed Feasibility Study (DFS), Detailed Technical Study (DTS), and The Mirine Survey (MS)using the later methods and subjected Financial Arrager (FA) tender to an open tender.
If you look at the overall project, the four services DFS, DTS, MS and FA are crucial to determining the time the project takes. Three of these projects DFS, DTS, and FA are complete and once the MS is complete, it would enable us to procure the supply contract with sufficient knowledge. Secoindly, whoever is awarded the contract, will actually immediately procure the material since all the information is available.
The argument that the MS is given along with the Suply contract does not hold water since there are many cable networks that have used the model. EASSY for example will not know the material requirement until the MS is complete. In technical terms they are several months behind Teams.
You must understand that there are several interested parties, some who want to make quick bucks. Ask yourself: what is it they are seeing that our people can't see? Consider Germany cable operators bagging in more that 6 billion euros in the last world cup in one month. My friend we need a serious talk. Seriously, if I had my way, I would give the entire works as a tunkey project. By now we could be at least three months to getting connected.
Regards
Bitange Ndemo.
---------------------------------------------- This message has been scanned for viruses and dangerous content by Jambo MailScanner, and is believed to be clean. --------------------------------------------- "easy access to the world"
_______________________________________________ kictanet mailing list kictanet@kictanet.or.ke http://kictanet.or.ke/mailman/listinfo/kictanet
Please unsubscribe or change your options at http://kictanet.or.ke/ mailman/options/kictanet/eric%40afrispa.org
Eric M.K Osiakwan Executive Secretary AfrISPA (www.afrispa.org) Tel: + 233.21.258800 ext 2031 Fax: + 233.21.258811 Cell: + 233.244.386792 Handle: eosiakwan Snail Mail: Pmb 208, Accra-North Office: BusyInternet - 42 Ring Road Central, Accra-North Blog: http://blogs.law.harvard.edu/eric/ Slang: "Tomorrow Now"
Dear Eric, I am out of the country but I know this week CCK shall formally introduce the Standard Bank (financial arranger) to formerly start incorporating the private sector and other stakeholders. I think everybody is simply impatient. We shall ensure that the processes are followed to the letter. I am only asking everybody to see the big picture. We shall deliver the cable a head of any other cable in EA. Teams is a means to an end while all others are an end to everthing. Regards Ndemo.
Dr. Ndemo,
Thanks for the elaborate explanation for which i have a question and caution; Q. Why is private sector, Academia and CS not represented on the Teams Project Committee given that it is a multi-stakeholder approach, correct me if am wrong?
C. As much as am for SPEED, lets make sure that we do all the checks and balances because some omissions may end up sticking us in the bud.
Eric here
On 14 Mar 2007, at 09:09, bitange@jambo.co.ke wrote:
Dear Wakabi, Thank you for raising the question on whether the Ministry ignored best practices in procurement. The answer is No. There are three approved methods of procurement, that is, open tender, selective tender and single sourcing. Open tender you have got to adverise and any interested party can bid to supply service. It is a lengthy procedure (takes a minimum 45 days). It is the most competitive of all. Logically it applies to goods that can be obtained from many sources.
Selective tendering however, is mostly applied to a sitiation where the popolation of the suppliers is limited as in Marine works. There are two companies, that is, Tyco and Alcatel that have the necesary experience to do such jobs. There are three other companies, that is, NEC, Fujistu and Global Marine/Huaweii that are usually subcontracted by the larger two. They have limited experience compared to the big two. Therefore it would have been absolutely non sense and wasteful to advertise for the the works in the local papers.
Single sourcing is used where there is only one supplier of service/ good or where there is an emergence. The committee which is tasked with the Teams project comprising the Investment Secretary, Director, Directorate of Procurement, MD Telkom, Solocitor General, and CCK Director General agreed to fast track the project by seeking authority from Treasury to procure Detailed Feasibility Study (DFS), Detailed Technical Study (DTS), and The Mirine Survey (MS)using the later methods and subjected Financial Arrager (FA) tender to an open tender.
If you look at the overall project, the four services DFS, DTS, MS and FA are crucial to determining the time the project takes. Three of these projects DFS, DTS, and FA are complete and once the MS is complete, it would enable us to procure the supply contract with sufficient knowledge. Secoindly, whoever is awarded the contract, will actually immediately procure the material since all the information is available.
The argument that the MS is given along with the Suply contract does not hold water since there are many cable networks that have used the model. EASSY for example will not know the material requirement until the MS is complete. In technical terms they are several months behind Teams.
You must understand that there are several interested parties, some who want to make quick bucks. Ask yourself: what is it they are seeing that our people can't see? Consider Germany cable operators bagging in more that 6 billion euros in the last world cup in one month. My friend we need a serious talk. Seriously, if I had my way, I would give the entire works as a tunkey project. By now we could be at least three months to getting connected.
Regards
Bitange Ndemo.
---------------------------------------------- This message has been scanned for viruses and dangerous content by Jambo MailScanner, and is believed to be clean. --------------------------------------------- "easy access to the world"
_______________________________________________ kictanet mailing list kictanet@kictanet.or.ke http://kictanet.or.ke/mailman/listinfo/kictanet
Please unsubscribe or change your options at http://kictanet.or.ke/ mailman/options/kictanet/eric%40afrispa.org
Eric M.K Osiakwan Executive Secretary AfrISPA (www.afrispa.org) Tel: + 233.21.258800 ext 2031 Fax: + 233.21.258811 Cell: + 233.244.386792 Handle: eosiakwan Snail Mail: Pmb 208, Accra-North Office: BusyInternet - 42 Ring Road Central, Accra-North Blog: http://blogs.law.harvard.edu/eric/ Slang: "Tomorrow Now"
---------------------------------------------- This message has been scanned for viruses and dangerous content by Jambo MailScanner, and is believed to be clean. --------------------------------------------- "easy access to the world"
_______________________________________________ kictanet mailing list kictanet@kictanet.or.ke http://kictanet.or.ke/mailman/listinfo/kictanet
Please unsubscribe or change your options at http://kictanet.or.ke/mailman/options/kictanet/bitange%40jambo.co.ke
---------------------------------------------- This message has been scanned for viruses and dangerous content by Jambo MailScanner, and is believed to be clean. --------------------------------------------- "easy access to the world"
Dr. Ndemo, Thanks for the clarity, we would excercise some pateince and co- operation. As you give out such periodic information it would help as much to see the big picture. Thank you. Eric here On 16 Mar 2007, at 00:10, bitange@jambo.co.ke wrote:
Dear Eric, I am out of the country but I know this week CCK shall formally introduce the Standard Bank (financial arranger) to formerly start incorporating the private sector and other stakeholders. I think everybody is simply impatient.
We shall ensure that the processes are followed to the letter. I am only asking everybody to see the big picture. We shall deliver the cable a head of any other cable in EA. Teams is a means to an end while all others are an end to everthing.
Regards
Ndemo.
Dr. Ndemo,
Thanks for the elaborate explanation for which i have a question and caution; Q. Why is private sector, Academia and CS not represented on the Teams Project Committee given that it is a multi-stakeholder approach, correct me if am wrong?
C. As much as am for SPEED, lets make sure that we do all the checks and balances because some omissions may end up sticking us in the bud.
Eric here
On 14 Mar 2007, at 09:09, bitange@jambo.co.ke wrote:
Dear Wakabi, Thank you for raising the question on whether the Ministry ignored best practices in procurement. The answer is No. There are three approved methods of procurement, that is, open tender, selective tender and single sourcing. Open tender you have got to adverise and any interested party can bid to supply service. It is a lengthy procedure (takes a minimum 45 days). It is the most competitive of all. Logically it applies to goods that can be obtained from many sources.
Selective tendering however, is mostly applied to a sitiation where the popolation of the suppliers is limited as in Marine works. There are two companies, that is, Tyco and Alcatel that have the necesary experience to do such jobs. There are three other companies, that is, NEC, Fujistu and Global Marine/Huaweii that are usually subcontracted by the larger two. They have limited experience compared to the big two. Therefore it would have been absolutely non sense and wasteful to advertise for the the works in the local papers.
Single sourcing is used where there is only one supplier of service/ good or where there is an emergence. The committee which is tasked with the Teams project comprising the Investment Secretary, Director, Directorate of Procurement, MD Telkom, Solocitor General, and CCK Director General agreed to fast track the project by seeking authority from Treasury to procure Detailed Feasibility Study (DFS), Detailed Technical Study (DTS), and The Mirine Survey (MS)using the later methods and subjected Financial Arrager (FA) tender to an open tender.
If you look at the overall project, the four services DFS, DTS, MS and FA are crucial to determining the time the project takes. Three of these projects DFS, DTS, and FA are complete and once the MS is complete, it would enable us to procure the supply contract with sufficient knowledge. Secoindly, whoever is awarded the contract, will actually immediately procure the material since all the information is available.
The argument that the MS is given along with the Suply contract does not hold water since there are many cable networks that have used the model. EASSY for example will not know the material requirement until the MS is complete. In technical terms they are several months behind Teams.
You must understand that there are several interested parties, some who want to make quick bucks. Ask yourself: what is it they are seeing that our people can't see? Consider Germany cable operators bagging in more that 6 billion euros in the last world cup in one month. My friend we need a serious talk. Seriously, if I had my way, I would give the entire works as a tunkey project. By now we could be at least three months to getting connected.
Regards
Bitange Ndemo.
---------------------------------------------- This message has been scanned for viruses and dangerous content by Jambo MailScanner, and is believed to be clean. --------------------------------------------- "easy access to the world"
_______________________________________________ kictanet mailing list kictanet@kictanet.or.ke http://kictanet.or.ke/mailman/listinfo/kictanet
Please unsubscribe or change your options at http://kictanet.or.ke/ mailman/options/kictanet/eric%40afrispa.org
Eric M.K Osiakwan Executive Secretary AfrISPA (www.afrispa.org) Tel: + 233.21.258800 ext 2031 Fax: + 233.21.258811 Cell: + 233.244.386792 Handle: eosiakwan Snail Mail: Pmb 208, Accra-North Office: BusyInternet - 42 Ring Road Central, Accra-North Blog: http://blogs.law.harvard.edu/eric/ Slang: "Tomorrow Now"
---------------------------------------------- This message has been scanned for viruses and dangerous content by Jambo MailScanner, and is believed to be clean. --------------------------------------------- "easy access to the world"
_______________________________________________ kictanet mailing list kictanet@kictanet.or.ke http://kictanet.or.ke/mailman/listinfo/kictanet
Please unsubscribe or change your options at http://kictanet.or.ke/mailman/options/kictanet/bitange%40jambo.co.ke
---------------------------------------------- This message has been scanned for viruses and dangerous content by Jambo MailScanner, and is believed to be clean. --------------------------------------------- "easy access to the world"
_______________________________________________ kictanet mailing list kictanet@kictanet.or.ke http://kictanet.or.ke/mailman/listinfo/kictanet
Please unsubscribe or change your options at http://kictanet.or.ke/ mailman/options/kictanet/eric%40afrispa.org
Eric M.K Osiakwan Executive Secretary AfrISPA (www.afrispa.org) Tel: + 233.21.258800 ext 2031 Fax: + 233.21.258811 Cell: + 233.244.386792 Handle: eosiakwan Snail Mail: Pmb 208, Accra-North Office: BusyInternet - 42 Ring Road Central, Accra-North Blog: http://blogs.law.harvard.edu/eric/ Slang: "Tomorrow Now"
Okay...so far so good. How I wish everyone could see it as clearly as described below. My fear is that Kenyans have a knack for smelling ghosts(& rats?) in all sorts of places. I would hate to see this process bogged down in courts for one reason or the other... walu. --- bitange@jambo.co.ke wrote:
Dear Wakabi, Thank you for raising the question on whether the Ministry ignored best practices in procurement. The answer is No. There are three approved methods of procurement, that is, open tender, selective tender and single sourcing. Open tender you have got to adverise and any interested party can bid to supply service. It is a lengthy procedure (takes a minimum 45 days). It is the most competitive of all. Logically it applies to goods that can be obtained from many sources.
Selective tendering however, is mostly applied to a sitiation where the popolation of the suppliers is limited as in Marine works. There are two companies, that is, Tyco and Alcatel that have the necesary experience to do such jobs. There are three other companies, that is, NEC, Fujistu and Global Marine/Huaweii that are usually subcontracted by the larger two. They have limited experience compared to the big two. Therefore it would have been absolutely non sense and wasteful to advertise for the the works in the local papers.
Single sourcing is used where there is only one supplier of service/good or where there is an emergence. The committee which is tasked with the Teams project comprising the Investment Secretary, Director, Directorate of Procurement, MD Telkom, Solocitor General, and CCK Director General agreed to fast track the project by seeking authority from Treasury to procure Detailed Feasibility Study (DFS), Detailed Technical Study (DTS), and The Mirine Survey (MS)using the later methods and subjected Financial Arrager (FA) tender to an open tender.
If you look at the overall project, the four services DFS, DTS, MS and FA are crucial to determining the time the project takes. Three of these projects DFS, DTS, and FA are complete and once the MS is complete, it would enable us to procure the supply contract with sufficient knowledge. Secoindly, whoever is awarded the contract, will actually immediately procure the material since all the information is available.
The argument that the MS is given along with the Suply contract does not hold water since there are many cable networks that have used the model. EASSY for example will not know the material requirement until the MS is complete. In technical terms they are several months behind Teams.
You must understand that there are several interested parties, some who want to make quick bucks. Ask yourself: what is it they are seeing that our people can't see? Consider Germany cable operators bagging in more that 6 billion euros in the last world cup in one month. My friend we need a serious talk. Seriously, if I had my way, I would give the entire works as a tunkey project. By now we could be at least three months to getting connected.
Regards
Bitange Ndemo.
---------------------------------------------- This message has been scanned for viruses and dangerous content by Jambo MailScanner, and is believed to be clean. --------------------------------------------- "easy access to the world"
_______________________________________________ kictanet mailing list kictanet@kictanet.or.ke http://kictanet.or.ke/mailman/listinfo/kictanet
Please unsubscribe or change your options at
http://kictanet.or.ke/mailman/options/kictanet/jwalu%40yahoo.com
____________________________________________________________________________________ Bored stiff? Loosen up... Download and play hundreds of games for free on Yahoo! Games. http://games.yahoo.com/games/front
Walu, Amen to that!!! LK
Okay...so far so good. How I wish everyone could see it as clearly as described below. My fear is that Kenyans have a knack for smelling ghosts(& rats?) in all sorts of places. I would hate to see this process bogged down in courts for one reason or the other...
walu.
--- bitange@jambo.co.ke wrote:
Dear Wakabi, Thank you for raising the question on whether the Ministry ignored best practices in procurement. The answer is No. There are three approved methods of procurement, that is, open tender, selective tender and single sourcing. Open tender you have got to adverise and any interested party can bid to supply service. It is a lengthy procedure (takes a minimum 45 days). It is the most competitive of all. Logically it applies to goods that can be obtained from many sources.
Selective tendering however, is mostly applied to a sitiation where the popolation of the suppliers is limited as in Marine works. There are two companies, that is, Tyco and Alcatel that have the necesary experience to do such jobs. There are three other companies, that is, NEC, Fujistu and Global Marine/Huaweii that are usually subcontracted by the larger two. They have limited experience compared to the big two. Therefore it would have been absolutely non sense and wasteful to advertise for the the works in the local papers.
Single sourcing is used where there is only one supplier of service/good or where there is an emergence. The committee which is tasked with the Teams project comprising the Investment Secretary, Director, Directorate of Procurement, MD Telkom, Solocitor General, and CCK Director General agreed to fast track the project by seeking authority from Treasury to procure Detailed Feasibility Study (DFS), Detailed Technical Study (DTS), and The Mirine Survey (MS)using the later methods and subjected Financial Arrager (FA) tender to an open tender.
If you look at the overall project, the four services DFS, DTS, MS and FA are crucial to determining the time the project takes. Three of these projects DFS, DTS, and FA are complete and once the MS is complete, it would enable us to procure the supply contract with sufficient knowledge. Secoindly, whoever is awarded the contract, will actually immediately procure the material since all the information is available.
The argument that the MS is given along with the Suply contract does not hold water since there are many cable networks that have used the model. EASSY for example will not know the material requirement until the MS is complete. In technical terms they are several months behind Teams.
You must understand that there are several interested parties, some who want to make quick bucks. Ask yourself: what is it they are seeing that our people can't see? Consider Germany cable operators bagging in more that 6 billion euros in the last world cup in one month. My friend we need a serious talk. Seriously, if I had my way, I would give the entire works as a tunkey project. By now we could be at least three months to getting connected.
Regards
Bitange Ndemo.
---------------------------------------------- This message has been scanned for viruses and dangerous content by Jambo MailScanner, and is believed to be clean. --------------------------------------------- "easy access to the world"
_______________________________________________ kictanet mailing list kictanet@kictanet.or.ke http://kictanet.or.ke/mailman/listinfo/kictanet
Please unsubscribe or change your options at
http://kictanet.or.ke/mailman/options/kictanet/jwalu%40yahoo.com
____________________________________________________________________________________ Bored stiff? Loosen up... Download and play hundreds of games for free on Yahoo! Games. http://games.yahoo.com/games/front
_______________________________________________ kictanet mailing list kictanet@kictanet.or.ke http://kictanet.or.ke/mailman/listinfo/kictanet
Please unsubscribe or change your options at http://kictanet.or.ke/mailman/options/kictanet/lkimani%40comnews.co.ke
----------------------------------------- This email was sent using Communicatons Solutions LTD WebMail. " " http://www.accesskenya.com/
John Walubengo <jwalu@yahoo.com> wrote: My fear is that Kenyans have a knack for smelling ghosts(& rats?) in all sorts of places. I would hate to see this process bogged down in courts for one reason or the other... walu. On courts, just to tinker with legal wording:- The law is not the private property of lawyers, nor is justice the exclusive province of judges and juries. In the final analysis, true justice is not a matter of courts and law books, but of a commitment in each of us to liberty and mutual respect. Jimmy Carter quotes (American 39th US President (1977-81). Nobel Prize for Peace in 2002. b.1924) Also: "..conflicts in this world are due to resources, are due to the fact that there are those of us who feel like we have a right to access resources, whatever they are. We have a right to exploit those resources, whatever they are. And we do not feel obligated to share those resources, equitably. We want to exclude..... Sooner or later, those who are excluded become angry and they react." Prof. Wangari Maathai, 2004 Nobel Peace Laureate, September 20th, 2005 <http://www.democracynow.org/article.pl?sid=05/09/20/1330227> The Internet is the single biggest resource in the world today, and it must be urgently pursued, widely distributed, and aggressively protected so that it can benefit everyone. /Alex --------------------------------- Looking for earth-friendly autos? Browse Top Cars by "Green Rating" at Yahoo! Autos' Green Center.
Dr. Ndemo, Thank you for the detailed explanation. Two comments, first to the media for following up and asking the right questions. I think it is great first that the cable is being noticed in the media and I hope they will continue to give it due coverage not just because of the cash $$$ involved but also the significant strategic position the cable holds for us as Kenyan. So Wakabi and others, please continue to ensure full transparence is maintained. Second comment; Alongside that and at the risk of creating more questions than answers. China and Dubai for example were able to grow as fast as they did as their decision making and implementation process were not subject to lengthy procurement processes (The Democracy we enjoy). They basically went ahead and build. ICT is such that we need to move at a very fast pace and to remain competitive. I am certain that is why there are the three procurement options you outlined below by the PS. With the kind of competition in this space, both internal and external, we must ensure as much as possible not to delay the implementation of the cable projects. Finally Bwana PS, I am sure like many others in the list your last comment created some excitements and I would want more details on the progress so far. Three months to connection would be a great day for us.
My friend we need a serious talk. Seriously, if I had my way, I would give the entire works as a tunkey project. By now we could be at least three months to getting connected.
Where are we in reality.v -- Joseph Mucheru Executive Director mucheru@wananchi.com
From: <bitange@jambo.co.ke> Reply-To: Kenya ICT Action Network - KICTANet <kictanet@kictanet.or.ke> Date: Wed, 14 Mar 2007 09:09:46 +0300 (EAT) To: <mucheru@wananchi.com> Subject: Re: [kictanet] [Fwd: [Fibre-for-africa] Kenya's fibre optic cable project queried]
Dear Wakabi, Thank you for raising the question on whether the Ministry ignored best practices in procurement. The answer is No. There are three approved methods of procurement, that is, open tender, selective tender and single sourcing. Open tender you have got to adverise and any interested party can bid to supply service. It is a lengthy procedure (takes a minimum 45 days). It is the most competitive of all. Logically it applies to goods that can be obtained from many sources.
Selective tendering however, is mostly applied to a sitiation where the popolation of the suppliers is limited as in Marine works. There are two companies, that is, Tyco and Alcatel that have the necesary experience to do such jobs. There are three other companies, that is, NEC, Fujistu and Global Marine/Huaweii that are usually subcontracted by the larger two. They have limited experience compared to the big two. Therefore it would have been absolutely non sense and wasteful to advertise for the the works in the local papers.
Single sourcing is used where there is only one supplier of service/good or where there is an emergence. The committee which is tasked with the Teams project comprising the Investment Secretary, Director, Directorate of Procurement, MD Telkom, Solocitor General, and CCK Director General agreed to fast track the project by seeking authority from Treasury to procure Detailed Feasibility Study (DFS), Detailed Technical Study (DTS), and The Mirine Survey (MS)using the later methods and subjected Financial Arrager (FA) tender to an open tender.
If you look at the overall project, the four services DFS, DTS, MS and FA are crucial to determining the time the project takes. Three of these projects DFS, DTS, and FA are complete and once the MS is complete, it would enable us to procure the supply contract with sufficient knowledge. Secoindly, whoever is awarded the contract, will actually immediately procure the material since all the information is available.
The argument that the MS is given along with the Suply contract does not hold water since there are many cable networks that have used the model. EASSY for example will not know the material requirement until the MS is complete. In technical terms they are several months behind Teams.
You must understand that there are several interested parties, some who want to make quick bucks. Ask yourself: what is it they are seeing that our people can't see? Consider Germany cable operators bagging in more that 6 billion euros in the last world cup in one month. My friend we need a serious talk. Seriously, if I had my way, I would give the entire works as a tunkey project. By now we could be at least three months to getting connected.
Regards
Bitange Ndemo.
---------------------------------------------- This message has been scanned for viruses and dangerous content by Jambo MailScanner, and is believed to be clean. --------------------------------------------- "easy access to the world"
_______________________________________________ kictanet mailing list kictanet@kictanet.or.ke http://kictanet.or.ke/mailman/listinfo/kictanet
Please unsubscribe or change your options at http://kictanet.or.ke/mailman/options/kictanet/mucheru%40wananchi.com
participants (6)
-
Alex Gakuru
-
bitange@jambo.co.ke
-
Eric Osiakwan
-
John Walubengo
-
Joseph Mucheru
-
Lucy Kimani